Feature request for self test - change order of tests
 
Avisos
Vaciar todo

Feature request for self test - change order of tests  

  RSS
stahlfabrik
(@stahlfabrik)
Honorable Member
Feature request for self test - change order of tests

Hi,

currently I struggle with a quite persistent X axis length error.

The sad thing is that each test takes ca 5 to 10 minutes - because the self test tests the hot end before the axis. And each time that I want to restart the self test the machine waits for the nozzle cooling down. This makes me insane.

So what I wished the test was like:

1. sensor (because it is super quick)
2. axis (because nothing has to cool down before a retry)
3. hotend
4. bed

Best regards

Respondido : 28/12/2017 12:10 am
JoanTabb
(@joantabb)
Veteran Member Moderator
Re: Feature request for self test - change order of tests

seems like a valid request...

my Y axis complained a bit so I slackened the belt a tiny bit... using one of the screws on the front idler housing. fingers crossed thats the end of that particular issue.

regards Joan

I try to make safe suggestions,You should understand the context and ensure you are happy that they are safe before attempting to apply my suggestions, what you do, is YOUR responsibility.Location Halifax UK

Respondido : 28/12/2017 3:41 am
JLTX
 JLTX
(@jltx)
Reputable Member
Re: Feature request for self test - change order of tests


Hi,

currently I struggle with a quite persistent X axis length error.

The sad thing is that each test takes ca 5 to 10 minutes - because the self test tests the hot end before the axis. And each time that I want to restart the self test the machine waits for the nozzle cooling down. This makes me insane.

So what I wished the test was like:

1. sensor (because it is super quick)
2. axis (because nothing has to cool down before a retry)
3. hotend
4. bed

Best regards

This. And also, don't leave the nozzle jammed against the bed while waiting for it to heat up. More like a self-restraint test. 🙂

Respondido : 28/12/2017 5:31 am
JLTX
 JLTX
(@jltx)
Reputable Member
Re: Feature request for self test - change order of tests

I modified the firmware to add an abbreviated self test that only tests the belts with no waiting on temperature. It just displays the results but does not save them to eeprom. Now I can iterate quickly.

Respondido : 29/12/2017 5:33 am
Compartir: